|
JOINT VENTURE PROJECT ARCHITECTS Design Architect: RTKL, Washington D.C. www.rtkl.com Executive Architect: JMA, Las Vegas www.jmaarch.com GENERAL CONTRACTOR Clark Construction Group www.clarkconstruction.com Hunt Construction www.huntconstructiongroup.com INSTALLER Custom Fabricators www.cmfinc.com VAPROSHIELD REPRESENTATIVE Dan Hennessy Arc Tech Solutions 5025 N. Central Ave, #446 Phoenix, AZ 85012 (602) 617-1760
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
PRODUCT(S) WRAPSHIELDSA® SELF-ADHERED PROJECT DESCRIPTION Over 300,000 sq.ft. of WRAPSHIELDSA® SELF-ADHERED was installed over Trespa, metal and brick exterior cladding. WRAPSHIELDSA® SELF-ADHERED was chosen for its ease of installation and high permeability factor. Primer is not required, saving thousands on materials and labor costs. No special tools are needed to install WRAPSHIELDSA® SELF-ADHERED and VaproShield offers a 20 year warranty on all their products. The $364 million project is the largest construction contract ever awarded by the Veterans Administration and is on schedule for an October 2011 delivery. The phase four main hospital is 790,000 sq.ft., includes a 90- bed seven story tower and two-story 20-bed mental health facility. Materials include CMU block, poured-in-place concrete, architectural aluminum for windows and louvers, galvanized structural steel, metal panel systems and phenolic exterior wall panels.
|
|
 |
Over 300,000 sq.ft. of WRAPSHIELDSA® SELF-ADHERED being applied to VA Hospital main structure. |
 |
|
 |
| WRAPSHIELDSA® SELF-ADHERED easily installs around window openings. |
|