hampshire_corner

Hampshire High School, Hampshire, Illinois

This 390,000 sq. ft. project is a replacement for the existing Hampshire High School and Middle School with current capacity for 750 students.

The new facility capacity tops out at 2,500 with a 750-seat auditorium, 2,500 seat gymnasium and 100 seat lecture center.

PROJECT ARCHITECTS
Burnidge & Cassell, Elgin, IL

GENERAL CONTRACTOR
All American Exterior Solutions, Lake Zurich, IL

VAPROSHIELD REPRESENTATIVE
Jeff Limp
201 Wrightwood Avenue
Elmhurst, IL 60126
Phone: 630-832-3838
Fax: 630-832-0307
jeff@soundsalesltd.com

PRODUCT(S)
WRAPSHIELD®
VaproFlashing BLACK

PROJECT DESCRIPTION
This 390,000 sq. ft. project is a replacement for the existing Hampshire High School and Middle School with current capacity for 750 students. The new facility capacity tops out at 2,500 with a 750 seat auditorium, 2,500 seat gymnasium and 100 seat lecture center.

Approximately 8,000 sq. ft. of VaproShield WRAPSHIELD® was selected due to its ability as a breathable air barrier, in conjunction with required features behind a Trespa Rainscreen Cladding System, including: self-cinching, UV stability and black flashing behind open joint reveals.

hampshire0Installation of VaproFlashing Black

         
hampshire1

WRAPSHIELD® (orange) installed under Trespa cladding.

hampshire2

Note installation of VaproFlashing Black

hampshire3

Application drawing of WRAPSHIELD® with VaproFlashing Black under open joint rain screen cladding system

 

Print Friendly Version (PDF, 384kb)