| ARCHITECT HDR Architecture Omaha, Nebraska 800-366-4411 BUILDING ENVELOPE CONSULTANT Stephane Hoffman Morrison Hershfield Corporation 10900 NE 8th Street, Suite 810 Bellevue, WA 98004 USA VAPROSHIELD REPRESENTATIVE Peter Vierthaler | VaproShield, LLC Gig Harbor, WA peterv@vaproshield.com 206-784-0920 PRODUCT(S) WRAPSHIELD SA® SELF-ADHERED PROJECT DESCRIPTION VaproShield WRAPSHIELD SA® SELF-ADHERED was installed in the $150 million expansion project of the Central Washington Hospital. 60,000 Sq.Ft. of WRAPSHIELD SA® SELF-ADHERED was used for complete adhesion to the modular wall system, protecting the panels during shipping while exposed during construction. A spray on moisture barrier was originally specified but the WRAPSHIELD SA® SELF-ADHERED proved to be a more cost effective choice while also providing a higher perm rating: 50 perms. The 190,000 Sq.Ft. addition includes one story underground and four above, and will nearly double the size of the region's largest trauma facility. Central Washington Hospital broke ground on August 25, 2009, and plans to complete the tower project in May 2011. |
|
|||||
![]() |
![]() |
|||||
|
The panels were pre-wrapped, protecting them during shipping.
|
The expansion project used 60,000 Sq.Ft. of WRAPSHIELD SA® SELF-ADHERED.
|
Print Friendly Version (PDF, 166kb)




