VaproShield High Performance Building Envelope Solutions
Left Image
Hampshire High School, Hampshire, Illinois
This 390,000 sq. ft. project is a replacement for the existing Hampshire High School and Middle School with current capacity for 750 students.

The new facility capacity tops out at 2,500 with a 750-seat auditorium, 2,500 seat gymnasium and 100 seat lecture center.

Print Friendly Version (PDF, 384kb)

PROJECT ARCHITECTS
Burnidge & Cassell, Elgin, IL

GENERAL CONTRACTOR
All American Exterior Solutions, Lake Zurich, IL

VAPROSHIELD REPRESENTATIVE
Jeff Limp
201 Wrightwood Avenue
Elmhurst, IL 60126
Phone: 630-832-3838
Fax: 630-832-0307
jeff@soundsalesltd.com

PRODUCT(S)
WrapShield ®
VaproFlashing BLACK

PROJECT DESCRIPTION
This 390,000 sq. ft. project is a replacement for the existing Hampshire High School and Middle School with current capacity for 750 students. The new facility capacity tops out at 2,500 with a 750-seat auditorium, 2,500 seat gymnasium and 100 seat lecture center.

Approximately 8,000 sq. ft. of VaproShield WrapShield was selected due to its ability as a breathable air barrier, in conjunction with required features behind a Trespa Rainscreen Cladding System, including: self-cinching, UV stability and black flashing behind open joint reveals.


Installation of VaproFlashing Black

         

WrapShield (orange) installed under Trespa cladding.

Note installation of VaproFlashing Black
 

Application drawing of WrapShield with VaproFlashing Black under open joint rain screen cladding system

 

Print Friendly Version (PDF, 384kb)