Circle_SS_fibers_small

SLOPESHIELD®

With a rating of 59 perms, SLOPESHIELD® provides the highest vapor permeability in a commercial quality, breathable roofing underlayment.

Printer Friendly English (PDF, 1293 Kb)
ICC-ES AC48 and AC207 Approval English (PDF, 351kb)

SLOPESHIELD® Approvals and Testing

PROPERTYSTANDARD/TESTRESULT RESULT RESULT
Tensile Strength

ASTM D1682
AC 48, Section 4.1

Control
MD – 106.7 lbf/inch
(18.7 N/mm)
XMD – 83.8 lbf/inch
PASS

Accelerated Aged
MD – 107.0 lbf/inch
(18.7 N/mm)
XMD – 81.4 lbf/inch
PASS
 UV Exposed
MD – 97.3 lbf/inch
(17.0 N/mm)
XMD - 76.7 lbf/inch
PASS

Water Vapor Transmission and Permeance

ASTM E96*
(Water Method)
AC 207, Section 4.1

406.3 g/m² 24hrs
3374.8 ng/Pa/s/m²
59 Perms
PASS

   

Water Ponding

AC 48, Section 4.4
24" head of water for 48 hrs.

PASS    
Accelarated Aging

AC48, Section 4.7
AC207, Section 4.6

PASS    

UV Exposure

AC48, Section 4.8
AC207, Section 4.7

PASS    

Liquid Water Transmission

ASTM D4869
AC207, Section 4.3
Showerhead impinges 40 to 42 gallons of water per hour for 4 hrs on sample.

PASS    

Rupture Resistance

ASTM D3462
AC207, Section 4.4

PASS    

Pliability

ASTM E48
AC 207, Section 4.2

PASS  



FIRE TESTING

PROPERTYSTANDARD/TESTRESULT
Flamespread Index ASTM E-84 10 – Class A
PASS
Smoke Development Index ASTM E-84 35 – Class A
PASS



INDEPENDENT TESTING

PROPERTYSTANDARD/TESTRESULT
Nominal Thickness Calibrated Deadweight Micrometer 0.020 inch (0.51mm)
Basis Weight Electronic Weight Scale 5.01 oz/yd² (0.55 oz/ft²)
170g/m²

Acceptance Criteria for Polypropylene Roof Underlayments AC 207 & Acceptance Criteria for Roof Underlayments for use in severe climate areas AC48. Tested in accordance with ICC-ES AC 48 and AC 207 criteria to meet UBC, IBC and IRC requirements for Roofing Underlayments.

*ASTM E 96 - Method B (wet cup method) typically gives a more realistic result for permeance than does the Method A (dry cut/desiccant) method.

 GraphImage

 

SlopeShield is not to be used as a temporary roof covering during the construction period. SlopeShield can sustain up to 4 months of UV exposure but is not intended to be the primary liquid water hold out barrier. Temporary protection measures such as tarps must be used when rain, snow/ice or storm events exist or are anticipated.

Printer Friendly English (PDF, 1293 Kb)
ICC-ES AC48 and AC207 Approval English (PDF, 351kb)